Case Study - 2.0 MW Nominal Geothermal Power Plant
Lake Naivasha, Kenya – 2007 Under a contract signed in June 2006 with Oserian, Geothermal Development Associates (GDA) agreed to design, manufacture, inspect, test, pack, and ship a 2 MW nominal geothermal steam turbine generator and related power plant auxiliary components from Reno, Nevada, USA to the Oserian flower-growing facility near Lake Naivasha, Kenya. GDA will provide technical ...
-
Case Study - 6MW Non-Condensing Power Plant
Lihir Island, Papua New Guinea – 2003 First Geothermal Power Station in PNG: Press Release, April 16, 2003 Lihir Gold Limited “Gold company Lihir Gold Limited is turning its vast geothermal resource into an opportunity. In April, the company started commissioning a 6MW geothermal power station, the first in Papua New Guinea to use natural geothermal energy for the generation of ...
-
Case Study - Aluto Langano Power Plant Rehabilitation
Aluto Langano, Ethiopia – 2007 The Aluto Langano Geothermal Pilot Plant (ALGPP) is located on the Aluto volcanic complex of the Ethiopian Rift valley, close to the eastern escarpment between Lake Langano and Lake Ziway, some 200 km southeast of Addis Ababa. The Aluto volcanic complex is a young acidic system consisting of domes, lava, and pyroclastic interbeds. The geothermal field was ...
-
Case Study - 30MW Single Flash Power Plant and 20 MW Expansion
Lihir Island, Papua New Guinea – 2005 In December 2003, Lihir Management Company awarded GDA a contract for supply and site supervision for a 30MW (net) geothermal power plant. In 2005, Lihir contracted with GDA for an additional 20 MW of plant equipment. The picture at the right shows the main power house and annex under construction. The power house is the larger open section which ...
-
Case Study - 2.4 MW Geothermal Wellhead Power Plant
Eburru, Kenya – 2012 Under a contract with Kenya Electricity Generating Company (KenGen), GDA designed, manufactured, tested, and shipped all of the major equipment for a 2.4 MW wellhead power plant at Eburru, Kenya. GDA also provided supervision and technical support during installation and commissioning of the plant. At the heart of the plant is an Elliott 8-stage GYR turbine. This ...
-
Lessons from Indonesia: Mobilizing Investment in Geothermal Energy
Developing countries will need about $531 billion of additional investments in clean energy technologies every year in order to limit global temperature rise to 2°C above pre-industrial levels, thus preventing climate change’s worst impacts. To attract investments on the scale required, developing country governments, with support from developed countries, must undertake ...
-
Talking Point: Geothermal systems and the value of maintenance programmes
Mike Deed, Managing Director of Geoquip Water Solutions, is the author of Talking Point in the October issue of Groundwater Engineering. He focuses on the huge benefits of installing a geothermal system and the importance of building in a maintenance programme at the outset to achieve the maximum potential from that system. He goes on to outline some of the problems that could compromise a ...