geothermal drill pipe Articles
1 articles found
-
Design of method and mechanism for geothermal energy extraction
By drilling using a specially designed hydride carbide (melting point: 1,365°C) drill, we can drill the earth's crust to about 5 to 40 km to reach temperatures of 700 to 1,000°C, with minimum cost of the drill and drilling technology. Further, we can extract energy by pouring in water on an inserted carbide alloy vessel into the drilled well and bringing out as steam to drive the turbines. By ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you