Power Plant Construction Articles & Analysis
-
Planning and construction of the Munich north combined heat and power plant
The Munich North combined heat and power plant, construction of which commmenced in the autumn of 1988, was a project that set new standards in terms not only of plant diversity and output rating but also of technological design. The present paper attempts to give a general outline of the plant design concept, which combines the aim of maximizing plant operating capabilities with a commitment to ...
By Kimre Inc.
-
Compilation of wind energy assessment software and wind energy assessment in the northwest of Iran
Development trend of wind data assessment software, Visual WIDA®, is discussed in this paper. In the beginning, theories and standards required for wind energy assessment which are used in the software are introduced and some methods provided by the writers for the calculation of the main parameters are described. Afterwards, capabilities of Visual WIDA are illustrated in detail. In this ...
-
Completion of Belene Nuclear Power Plant: project perspectives
The development of Belene NPP began with site selection in the 1970s, site characterisation in 1980–1981, and a decision to proceed in 1981. Construction was suspended for financial reasons in 1991. Now the state authorities have taken steps to continue the project. Despite the lengthy study period and the subsequent legislative changes, the evaluations indicate that Belene is a suitable NPP ...
-
The guarantee option against the construction cost overruns of nuclear power plant: Monte Carlo simulation approach
The financing process of nuclear power plant (NPP) remains the most complicated task to launch the nuclear programme. Even when the private partnership constitutes the basis of the financing arrangement, the construction cost overruns of NPP represent an important issue to complete the project. Hence, the International Atomic Energy Agency (2008) specifies that the financing arrangement for NPP ...
-
Newbuild Power Station in Karlsruhe - Case Study
EnBW is one of the biggest German energy suppliers. A major new build bituminous coal fired power plant construction project is the new boiler number 8 of the Rheinhafen Dampfkraftwerk (RDK) in Karlsruhe. The new boiler will have a capacity of 912 MWel with a heating capacity of 220 MWth. The unit will be erected beside the existing units RDK4s and RDK7 and have a net efficiency of > 46% ...
-
Halifax case study
Highway 101 Landfill Sackville, Nova Scotia In 2001 Highland Energy Inc. was contacted by the Halifax Regional Municipality regarding their recently closed landfill on route 101 in Sackville, Nova Scotia, with regards to determining the potential to develop a landfill gas to energy project. Highland conducted its due diligence and feasibility studies and concluded that, subject to certain ...
-
Bulk Cement Trucks
Bulk Cement Truck, also known as powder material transporter, consists of a special automobile chassis, a bulk cement tank body, a gas pipeline system, and an automatic unloading device. It is suitable for bulk transportation of fly ash, cement, lime powder, ore powder, granular alkali and other dry materials with particle diameter, not more than 0.1mm. Mainly used in cement plants, cement ...
-
An integrated assessment for wind energy in Lake Michigan coastal counties
The benefits and challenges of onshore and offshore wind energy development were assessed for a four‐county area of coastal Michigan. Economic, social, environmental, and spatial dimensions were considered. The coastal counties have suitable wind resources for energy development which could contribute toward Michigan's ten percent renewable energy standard. Wind energy is cost‐effective with ...
-
Project MLH2 Murphy Phase II - Case Study
Project Name: Murphy Phase II Location: Gainesville, FL Scale: 1MW Completion time: October 2012 Annual power generation: 351.92MWh Selling time: April 2015 The Murray Phase II ("MLH2") project, located in Alachua County, Florida,is the first large-scale ground power station project developed and constructed by Hanergy in the United States. TheMLH2 is 1 MW in scale, and the project ...
-
The Japanese fast-start finance contribution
Developed country governments have repeatedly committed to provide new and additional finance to help developing countries transition to low-carbon and climate-resilient growth. This assessment considers Japan’s efforts to provide “fast start finance” (FSF) between January 2010 and February 2012 in the context of the pledge by developed countries to mobilize USD 30 billion from ...
-
Clarke Energy Deliver EPC Trigeneration Plant to Medicef Pharma in Tunisa - Case Study
In 2022, a state-of-the-art trigeneration plant was commissioned at the pharmaceutical manufacturing facility Medicef Pharma in Tunisia. This innovative facility supplied and installed by Clarke Energy teams utilises an INNIO Jenbacher gas engine with an output of 0.8 MWe, primarily powered by natural gas. Clarke Energy has also provided full EPC construction of this trigeneration power plant ...
-
Solar Power Group takes a creative approach towards cost reduction to power the CSP industry ahead
Still dependent on subsidies and feed-in tariffs, the CSP industry needs to find creative ways to become more competitive within the renewables sector. CSP Today spoke to Mauricio Rojas, Head of Business Development at Solar Power Group, on the potential of hybridisation as a viable way to further market share What is the next step for CSP and where should companies focus their efforts to ...
-
Helping China deliver cleaner coal power – Case Study
To keep pace with the electricity demands of its rapidly growing economy, China’s coal-fired power plant construction is booming. Conscious of their environmental impact, China has focused on building efficient, low polluting plants. One imperative is to balancethe fuel to air ratio in the boilers. More accurate fuel to air ratios result in increased boiler efficiency and a reduction in ...
-
Chile RTS Ground Power Station Component Supply - Case Study
Project Name: RTS Location: Chile Scale: 2.2MW Completion time: June 2014 RTS Corporation is a well-known EPC construction company in Chile and has established good project development and business development partnerships with Hanergy America and the Chilean team. The RTS team has implemented a large number of installation practices and optimizations for CIGS component system in Chile; ...
-
Majority of China’s proposed coal-fired power plants located in water-stressed regions
To maintain its economic growth and provide for its massive population, China must reconcile two powerful, converging trends: energy demand and resource scarcity. One prime example of this tension is the country’s coal use and water supply. According to a new WRI analysis, more than half of China’s proposed coal-fired power plants are slated to be built in areas of high or extremely ...
-
A novel cogeneration cycle based on a recompression supercritical carbon dioxide cycle for waste heat recovery in nuclear power plants
In this study, a novel cogeneration cycle based on the recompression S–CO2 Brayton cycle is proposed, analysed and optimised thermodynamically to utilise the waste heat from a nuclear power plant. The cycle was constructed theoretically on the basis of a transcritical CO2 power cycle and a LiBr/H2O Absorption Heat Transformer (AHT) to enhance the overall performance of the cycle. It was found ...
-
Kelag demonstrates hydro power know-how in Bosnia-Herzegovina
Austrian energy companies are increasingly helping to expand the hydro power capacities in the Balkans. On the River Ugar, which today marks the border between the Federation of Bosnia-Herzegovina and the Republic of Srpska, the Novakovici runof- river power plant has been delivered by a subsidiary of the Carinthian utility company Kelag, InterEnergo. In a normal year, the high-pressure plant, ...
-
Smith College Energy Center - 3.5-MW CHP Plant - Case Study
Quick Facts LOCATION: Northampton, MA FACILITY PEAK LOAD: 3.5 megawatts (MW) EQUIPMENT: 3.5 MW Solar Turbine, Rentech HRSG, package boiler and two York absorption chillers. FUEL: Natural Gas USE OF THERMAL ENERGY: Heating, cooling & hot water for the campus. USE OF ELECTRICAL ENERGY: Displaces campus loads previously supplied by the local utility. AVERAGE CAPACITY FACTOR: 75 % CHP IN ...
-
Air Quality Permitting for a New Coal-Fired Power Plant: A Timeline
The high price of natural gas and alternative fuels has made utility companies take a second look at coal as a cheap, plentiful fuel source. For a greenfield plant considering coal, the environmental considerations are significant but not insurmountable. This article discusses the air quality regulations and permitting requirements that must be addressed, from New Source Review to greenhouse gas ...
-
Political support for nuclear power in Central Europe
Since the Fukushima nuclear disaster in Japan, nuclear energy has been under increased media scrutiny. The focus is mainly on Germany and the radical transformation of the position on nuclear energy in that country. To understand and potentially predict the development, however, the situation needs to be viewed from a wider Central European perspective. Polarisation of countries' attitudes ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you