Cable Monitoring Articles & Analysis
-
CETO 6 - Albany (WA) Project
The Albany Wave Energy Project commenced in 2017 and intended to build, deploy and operate a prototype CETO 6 Unit. The Western Australian Government committed $15.75m in funding which was subsequently withdrawn and the project has therefore ceased. Despite this, valuable work was done on developing one of the world’s most attractive sites for wave energy. Vessel conducting the ...
-
M40 & M80 USV Surveys Offshore Wind Farm Turbine Piles and Cable Scouring - Case Study
Date: January 15-22, 2019 Location: Jiangsu, China Equipment: M80 USV, Coda Octopus real time 3D imaging sonar Survey Mission: The purpose is to survey wind farm turbine pile foundation and inspect underwater cable scouring. 1. 15Km 100KV main cable inspection 2. 80Km 35KV loop cable inspection 3. 38 units of turbine 4. Booster station area Survey Efficiency The survey and ...
-
How to Monitor Data Centre Power Usage
There is now a huge desire amongst IT and Facilities professionals to adopt a suitable power management strategy, but implementation with existing tools can be extremely disruptive and problematic. Unless a new data centre is being built from scratch, installation of intelligent PDUs and inline power monitoring devices will ultimately result in considerable downtime and cost. However, a solution ...
By Jacarta Ltd.
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you