MWM - Model Tcg 2032 - Gas Engine
Gas engine TCG 2032 - Facts and Figures,Output range from 3,000 to 4,300 kwe ‒ MWM's largest series,Mainly used in large IPP projects with up to 100,000 kwe,Outstanding reliability and low maintenance costs, More than 400 power generators with approximately 1,400,000 kwe already installed around the globe
Low Operating Costs - Gas Engine Tcg 2032
High Efficiency and Low Lubricant Consumption
- High fuel utilization and low operation costs thanks to optimized chamber spark plug
- Increased efficiency through new closed crankcase ventilation that enables utilization of the blow-by gas
- High availability through long maintenance intervals: first maintenance after 4,000 h, major overhaul after 80,000 h
- Up to 30 percent lower annual lubricant consumption compared to competitor products thanks to optimized tappet sealing, coke stripping rings and ring packages
Soot-Free Combustion Increases Plant Profitability
- Open combustion chamber with chamber spark plug for soot-free combustion
- Extended maintenance intervals for the exhaust gas heat exchanger
- No pre-combustion chamber with time-consuming maintenance and risk of failure
- No additional gas supply with increased gas pressure required for pre-combustion chamber
Few Interruptions Due to Long Maintenance Intervals
- No more than two interruptions a year due to scheduled maintenance
- Longest interval until major overhaul compared to competitors
- Use of Xchange components enables time savings of up to 75 percent during the major overhaul, resulting in reduced costs
High Availability - Gas Engine Tcg 2032
New turbocharger technology increases genset availability
- Improved output under non-iso conditions
- High output of 4,300 kwe possible through use of a140 high-pressure turbocharger
- Turbocharger achieves higher compression ratio and enables operation under full load with intake air of up to 45°c
- Exhaust gas waste gate enables constant performance with different intake air temperatures and setup altitudes
- Evening out of reserve boost pressure in relation to load results in higher efficiency and improved load response
Low Installation Costs - Gas Engine Tcg 2032
Compact Engine Design for Easy Transport and Installation
- Extremely lean genset with compact dimensions, low noise emissions, and smooth running guarantees minimum installation costs
- Compared to competitors, the specific output/weight ratio is up to 40 percent better
- Lighter engine components eliminate need for strong crane
- Compared to competitors, TCG 2032 V16 is up to 30 percent shorter in length
- Low weight and compact dimensions enable easy transport even to remote destinations
Short Project Period - Gas Engine Tcg 2032
Short Project Period Thanks to Compact Setup
- Pre-manufactured components directly from the manufacturer ensure quick and easy assembly on site
- Identical setup of the individual modules facilitates flexible adjustment of the plant output
- Modest need for space through compact design
- Plant planning and building from one source guarantees smooth, cost-efficient project rollout
Lower Service Costs - Gas Engine Tcg 2032
Up to 20 percent lower service costs
- Enhanced maintenance concept through easy access to the cylinder units
- Long service intervals and improved serviceability
- Lower maintenance costs through 50 percent reduction in number of engine parts compared to predecessor, resulting in lower maintenance overhead and reduced need for spare parts
- Lower maintenance overhead through open combustion chamber with pre-combustion chamber spark plug
Customer reviews
No reviews were found for MWM - Model Tcg 2032 - Gas Engine. Be the first to review!