Electrostatic precipitator (ESP) efficiency (inlet/outlet) testing on a 150-megawatt coal fired unit. Total suspended particulate tests (EPA Methods 1-5) were performed on varying ESP voltages. Once ESP was optimized particle size distribution (PSD) tests were performed to determine rapping sequence. Sulfur trioxide carry-over testing on a 390-megawatt coal fired unit equipped with a sulfur trioxide (SO3) injection system prior to the ESP. SO3 testing was performed at the outlet of the ESP to determine proper SO3 injection rate.
-
Most popular related searches
Compliance testing for a 750-megawatt coal fired s...
Compliance testing for a 750-megawatt coal fired steam generator equipped with flue gas recirculation (FGR) included TSP, SO2, NOx, and CO. Federal regulatory agency required detailed test protocol and final report with full data package.
Central heating plant containing four boilers (30,000 to 80,000 pounds per hour) equipped with Low-NOx burners capable of firing natural gas and No. 2 fuel oil. Burner optimization was performed prior to compliance testing for TSP, NOx, and CO.
Compliance testing performed on two internal combustion engines (800 HP) equipped with selective catalytic reduction